One of my larger jobs, the 1967 bay required a rather large amount of metal work, the van has been in the same family since 1967 they bought it at 6 months old, the vehicle has be driven far and wide, as far as Pakistan and back. It had also had a huge amount of temporary repairs on repairs on repairs, from sheet metal being welded on top of the entire cargo floor to a piece of string holding the fuel line on. The van was mot’d and finished just in time for the wedding on the Saturday. On the Monday it took its maiden voyage to Barcelona, there and back 2500 miles and didn’t miss a beat 🙂
Roof replacement.
One very rotten roof…
Back to good metal.
Reconstruction of the roof box sections
Roof finally on.
Entire cargo floor removed…
Front end removal.
Step and arches inner a post and cab floor sections removed
Lower front inner removed,the end of the chassis legs and A posts had to be rebuild befor the front could go back on.
Front end neatly finished.
New seat tubs,floor and reclaimed californian step and arches.
Replacement corner in place.
Off side rear corner and D post removed.
This front beam i deemed to be beyond repair so got a replacement.